Floodrisk2012

FloodProBE are partners in FLOODrisk2012

Grant Agreement No:243401

WP3 - Reliability of Urban Flood Defences

    
WP3 Main Image

Urban flood defences comprise both soft soil embankments and hard structures. Failures are very often caused by internal and / or external erosion processes, particularly at transitions between defence types. Complex combinations of defence types are typical in urban areas. Since flood defence systems are only as strong as the weakest links (“risk hotspots”), these have to be identified, assessed and strengthened.

The overall objective of WP3 is to improve the performance (reliability) and assessment of urban flood defences and to underpin the construction technologies developed in WP4. Methods from WP3 will also support and mesh with the integrated decision support methods identified in WP5. The research will build up on the results of recent or on-going projects such as the European FLOODsite and ComCoast projects and national/regional projects such as FRMRC (UK), RIMAX (DE), NOAH/FLIWAS(NL, DE), FloodControl2015, SBW (NL), Criterre and ERINOH (FR).

Two key goals of this work are:

  • To improve fundamental understanding of erosion failure processes that have proven to be critical in recent major flood events in urban areas.
  • To increase the effectiveness and efficiency of risk based asset management by applying and refining innovative and cost-effective measurement and monitoring technologies in combination with other information sources for the identification of high risk areas (weak spots).

To achieve these goals a series of Tasks have been structured, through which different research actions are being undertaken:

  • Overview
  • Action 3.1.1 Internal erosion.

  • Action 3.1.2 Structure transitions: performance, design and repair solutions
  • Action 3.1.3 Performance of vegetation during flooding.

  • Overview
  • Action 3.2.1 Rapid, non intrusive geophysical methods for assessing dikes.
  • Action 3.2.2 Remote sensing.
  • Overview

Schedule

Output Name Expected Document
Pilot Case Study - Orleans June 2011
LIDAR Survey Results September 2011  
Geophysics workshop presentation / summary September 2011  



Bio
Researcher-engineer with 30 years' experience in civil engineering, particularly in the field of dams and dikes. In Cemagref, he acts as scientific coordinator for research and expertise activities in hydraulic works' safety.

Bio
Over 20 years experience of flood risk analysis and management work covering both research and consultancy. Mark was Co-ordinator for the European CADAM and IMPACT Projects, was Deputy Co-ordinator for the European FLOODsite Project and is leading the HR Wallingford R&D programme on breach modelling (the HR BREACH model). Mark is member of the UK Government Reservoir Safety Advisory Group and the US ASCE Task Committee on Dam/Levee Break.

Relevant Links: